Korrekte installering en ingebruikneming van elektriese kettinghyser

November 07 2024

Die 5 ton elektriese kettinghyser is a commonly used lifting tool, widely used in industrial and mining enterprises, logistics and warehousing and other fields. Correct installation and commissioning of electric chain hoist is the key to ensure its safe use.

 

Installation

 

Choose a suitable location: Before installing the gemotoriseerde kettinghyser, you must first choose a suitable location. Ensure that the hoist installation location has sufficient load-bearing capacity to avoid accidents caused by insufficient load.

 

Install the hoist bracket: Fix the hoist bracket in a suitable position to ensure that the bracket is firm and reliable. The connection between the bracket and the hoist should be kept horizontal to prevent the hoist from tilting during use.

 

Install the power supply: Connect it to the power supply according to the power supply requirements of the motorized chain hoist. Ensure that the power supply voltage is stable and meets the use requirements of the hoist.

 

Install the hoist: Hang the motorized chain hoist on the bracket to ensure that the hoist is firmly connected to the bracket. Check whether the hoist’s suspension device is intact. If damaged, it should be replaced in time.

Test

 

Check the mechanical part of the hoist: Before debugging, check whether the mechanical part is intact, including sprockets, chains, hooks, etc. If there is wear or damage, it should be replaced in time.

 

Debug the chain: Adjust the tightness of the chain so that it is smooth and not too loose during operation. A too tight chain will increase the motor load, and a too loose chain may cause unstable operation.

 

Check the limiter: Check whether the elektriese hysbak met afstandbeheer limiter is working properly. The limiter can prevent the hoist from exceeding the limit during the rise or fall process to ensure safe use.

 

Debug the control system: Check whether the control system of the electric hoist with remote control is normal, including the start, stop, rise, and fall buttons. Ensure that the control system is sensitive, reliable, and easy to operate.

 

Test the hoist: After completing the above debugging, perform actual testing. Lift the hoist to a certain height, then lower it, and observe whether it runs smoothly and whether there is any abnormal sound. If any problems are found, adjust them in time.

 

Correct installation and debugging of the 5 ton elektriese kettinghyser is the key to ensure its safe use. During use, attention should be paid to operator training, regular inspection and maintenance, and compliance with safety regulations to reduce the risk of accidents.

Tuis

Tel

Pos

Ondersoek

Kontak nou!