How to Install a Pillar Jib Crane: A Clear and Concise Guide

Mart 24 2025

Installing a floor-mounted pillar jib crane requires careful planning and execution to ensure proper alignment, stability, and safe operation. Here’s a streamlined guide to help you through the process:

 

Pre-Installation Preparation

– Review the Manual: Thoroughly read the manufacturer’s installation manual. 

-Inspect the Foundation: Ensure the concrete foundation is cured, and its dimensions and depth meet the manufacturer’s specifications.

-Gather Tools and Components: Collect all necessary tools, equipment, and floor mounted jib crane components.

 

Foundation Inspection

-Verify Foundation: Confirm that the foundation is properly cured and meets the required specifications.

 

Assembly of Crane Components

-Assemble Components: Put together the jib arm, support pillar, hoist, trolley, and other components as per the manufacturer’s instructions.

 

Placing the Support Pillar

-Position the Pillar: Place the support pillar over the anchor bolts embedded in the foundation.

– Align Vertically: Use a level to ensure the pillar is vertically aligned and make any necessary adjustments.

 

Securing the Support Pillar

– Attach Fasteners: Secure the pillar to the anchor bolts using nuts, washers, and other fastening components.

– Tighten to Torque: Use a torque wrench to tighten the nuts to the specified torque.

 

Attaching the Jib Arm

– Mount the Jib Arm: Attach the jib arm to the top of the support pillar using the appropriate bolts and fasteners.

– Ensure Leveling: Check that the jib arm is level and properly aligned with the support pillar.

 

Hoist and Trolley Installation

– Install Hoist and Trolley: Mount the hoist and trolley onto the jib arm, following the manufacturer’s instructions.

– Secure Connections: Ensure all connections are secure and components are properly fastened.

 

Electrical Connection

– Wire the Components: Connect the hoist and trolley to the power supply using the manufacturer’s wiring diagram.

– Insulate and Secure: Ensure all electrical connections are properly insulated and secured.

 

Set up a maintenance schedule to regularly inspect, lubricate, and maintain the sütunlu pergel vinç for safe and efficient operation. If you’re not experienced with crane installation, consider seeking help from professionals or contacting the manufacturer’s technical support. By following these streamlined steps, you can ensure a safe and efficient installation of your floor-mounted pillar jib crane.